Post-Flood Structural Dry-Out, Culvert Clearing & Biohazard Remediation Kit (Pin/Pinless Masonry Moisture Meter, Telescopic Culvert Rake, Squeegee & DEFRA Disinfectant) (OGA-FLD-124)
Clear blocked culvert trash screens safely from the bank, sanitize raw sewage silt, and track brick/joist drying below 15% WME to stop toxic black mould.
UK Blackout & Field Application
Provides the physical culvert drag-rake to clear blinded upstream trash screens without stepping into fast-flowing floodwater, plus the PAS 64 / CIRIA C790 moisture metrology and virucidal chemistry to remediate sewage contamination and prevent structural dry-rot.
Engineered for Both across Great Britain. In a prolonged utility outage, Post-Flood Structural Dry-Out, Culvert Clearing & Biohazard Remediation Kit (Pin/Pinless Masonry Moisture Meter, Telescopic Culvert Rake, Squeegee & DEFRA Disinfectant) provides dependable off-grid capability backed by our UK warehouse support and plain-English commissioning documentation. Every unit is inspected prior to dispatch with an estimated UK delivery window of 24h.
Verified Technical Specifications
| Catalogue SKU | OGA-FLD-124 (EOD-FLD-124) |
|---|---|
| System Category | Storm, Flood Defence & Submersible Pumps |
| UK Retail Price | £145.00 (Final GBP Price — Non-VAT Registered) |
| UK Dispatch Lead Time | 24h |
| Engineering Specifications | Once the floodwater recedes, hidden moisture inside brick cavity walls and floorboards triggers toxic black mould (Stachybotrys) within 48 hours, while sewage silt carries E. coli and Leptospirosis. Includes a Dual-Mode Pin & Pinless Deep-Wall Moisture Meter & Thermo-Hygrometer (tracks wood & masonry drying down to <15% WME), a Heavy-Duty Forged Culvert Grille Drag-Hook / Debris Rake (to clear blocked culvert trash screens safely from the bank!), a 600mm twin-blade neoprene floor squeegee, chemical-resistant gauntlets, and 5L Broad-Spectrum Virucidal/Bactericidal Post-Flood Sanitiser Concentrate. |
Companion UK Hardware & Reference Manuals
- OGA-FLD-117 — Hydro-Sack / FloodSax 20-Pack Self-Inflating Polymer Flood Barriers + 50× Heavy-Duty Rot-Proof Woven Polypropylene Sandbags & Tie-Cord Bale (£159)
- OGA-FLD-118 — Home Perimeter Flood Ingress & Sewage Backflow Stop Kit (4× Rapid-Seal Airbrick Covers, Toilet Pan Non-Return Flood Bung, Gully Bladders & CT1 Wet-Sealant Gun) (£139)
- OGA-FLD-119 — 400W Low-Level "Puddle Sucker" 1mm Residue Submersible Floor Pump + Non-Return Valve & 15m Reinforced Layflat Hose Kit (£165)
- OGA-FLD-120 — 1100W Stainless Dirty-Water Vortex Submersible Flood Pump (16,500 L/hr, 35mm Solids Handling) + Float Switch & 20m 50mm (2") Layflat Hose Kit (£189)
- Return to Full UK Hardware Catalogue
Frequently Asked Questions
Is the Post-Flood Structural Dry-Out, Culvert Clearing & Biohazard Remediation Kit (Pin/Pinless Masonry Moisture Meter, Telescopic Culvert Rake, Squeegee & DEFRA Disinfectant) (OGA-FLD-124) supplied ready for UK 230V 50Hz / British regulatory standards?
Yes. OGA-FLD-124 is stocked and configured specifically for UK households and smallholdings (Storm, Flood Defence & Submersible Pumps), with full technical specifications: Once the floodwater recedes, hidden moisture inside brick cavity walls and floorboards triggers toxic black mould (Stachybotrys) within 48 hours, while sewage silt carries E. coli and Leptospirosis. Includes a Dual-Mode Pin & Pinless Deep-Wall Moisture Meter & Thermo-Hygrometer (tracks wood & masonry drying down to <15% WME), a Heavy-Duty Forged Culvert Grille Drag-Hook / Debris Rake (to clear blocked culvert trash screens safely from the bank!), a 600mm twin-blade neoprene floor squeegee, chemical-resistant gauntlets, and 5L Broad-Spectrum Virucidal/Bactericidal Post-Flood Sanitiser Concentrate..
What is the UK price and dispatch lead time for OGA-FLD-124?
The final UK price for Post-Flood Structural Dry-Out, Culvert Clearing & Biohazard Remediation Kit (Pin/Pinless Masonry Moisture Meter, Telescopic Culvert Rake, Squeegee & DEFRA Disinfectant) is £145.00 (non-VAT registered, zero hidden tax additions) with an estimated dispatch lead time of 24h.